Figure 1. Data Processing Set AN/UYK-64 (V), TypicalChapter 1 INTRODUCTION - TM-11-7021-202-120011DESTRUCTION OF ARMY ELECTRONICS MATERIEL - TM-11-7021-202-120012Section Il. EQUIPMENT DESCRIPTION AND DATATable 1-2. Processor Characteristics, Capabilities, and FeaturesTable 1-2. Processor Characteristics, Capabilities, and Features -- Continued - TM-11-7021-202-120015Table 1-2. Processor Characteristics, Capabilities, and Features -- Continued - TM-11-7021-202-120016LOCATION AND DESCRIPTION OF MAJOR COMPONENTS - TM-11-7021-202-120017Table 1-3. Front Panel Connectors, Indicators, Controls, and FusesTable 1-3. Front Panel Connectors, Indicators, Controls, and Fuses -- ContinuedFigure 1-1. Processor, Semiconductor-and Core-Based, Component LocationsFigure 1-2. Processor Rear ViewsFigure 1-3. Processor Front PanelsDIFFERENCES BETWEEN MODELS - TM-11-7021-202-120023Table 1-4. Data Processing Set AN/UYK-64 (V), Configuration MatrixTable 1-4. Data Processing Set AN/UYK-64 (V), Configuration Matrix -- ContinuedSAFETY PRECAUTIONS - TM-11-7021-202-120026Section Ill. PRINCIPLES OF OPERATIONFloating Point Unit (FPU)Major Subsystems and System Buses cont'dBus UtilizationChapter 2 OPERATING INSTRUCTIONS - TM-11-7021-202-120031DESCRIPTION OF OPERATOR'S CONTROLS AND INDICATORSSection Il. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES Procedure columnRoutine Services - TM-11-7021-202-120035EQUIPMENT INSPECTION AND MAINTENANCE WORKSHEET - TM-11-7021-202-120036Table 2-1. Operator Preventive Maintenance Checks and Services - TM-11-7021-202-120037Section Ill. OPERATION UNDER USUAL CONDITIONS - TM-11-7021-202-120039Power-Up Procedure.Section IV. OPERATION UNDER UNUSUAL CONDITIONS - TM-11-7021-202-120041CHAPTER 3 OPERATOR'S MAINTENANCE - TM-11-7021-202-120043REMOVING FUSESINSTALLING FUSESChapter 4 ORGANIZATIONAL MAINTENANCE - TM-11-7021-202-120047Section I. TROUBLESHOOTINGFigure 4-1. How to Use the Flowchart, Sample Flowchart - TM-11-7021-202-120050Table 4-1. Processor Malfunction/Symptom IndexTROUBLESHOOTING FLOWCHART 1 - TM-11-7021-202-120052TROUBLESHOOTING FLOWCHART 1 - TM-11-7021-202-120053TROUBLESHOOTING FLOWCHART 1 - TM-11-7021-202-120054TROUBLESHOOTING FLOWCHART 2 - TM-11-7021-202-120055TROUBLESHOOTING FLOWCHART 3TROUBLESHOOTING PROCEDURESNoisy Blower FanSection Ill. ORGANIZATIONAL MAINTNANCE PROCEDURESSection IV. REMOVAL AND REPLACEMENT PROCEDURES - TM-11-7021-202-120060INSTALLING PROCESSORREMOVING POWER CABLE - TM-11-7021-202-120062INSTALLING POWER CABLE - TM-11-7021-202-120063REMOVING I/O SIGNAL CABLES - TM-11-7021-202-120064INSTALLING I/O SIGNAL CABLES - TM-11-7021-202-120065CLEANING - TM-11-7021-202-120066TESTING AFTER REPLACEMENTS OR REPAIRSCHAPTER 5 PACKING FOR SHIPMENT OR STORAGE - TM-11-7021-202-120069PROCESSOR PACKAGING AND PACKING Figure 5-1. Packing a Typical Unit - TM-11-7021-202-120071APPENDIX A REFERENCES - TM-11-7021-202-120073SUPPLY BULLETINSAPPENDIX B MAINTENANCE ALLOCATION CHART PROCESSING SET AN/UYK-64(V) COLUMN ENTRIES - TM-11-7021-202-120076TOOL AND TEST EQUIPMENT REQUIREMENTS (SECTION III) - TM-11-7021-202-120077SECTION Il. MAINTENANCE ALLOCATION CHART FOR PROPCESSING SET ANUYK-64(V)SECTION Il. MAINTENANCE ALLOCATION CHART FOR PROPCESSING SET ANUYK-64(V) cont'd - TM-11-7021-202-120079SECTION Il. MAINTENANCE ALLOCATION CHART FOR PROPCESSING SET ANUYK-64(V) cont'd - TM-11-7021-202-120080SECTION Il. MAINTENANCE ALLOCATION CHART FOR PROPCESSING SET ANUYK-64(V) cont'd - TM-11-7021-202-120081SECTION Ill. TOOL AND TEST EQUIPMENT REQUIREMENTS FOR PROCESSING SET AN/UYK-64(V)SECTION IV. REMARKS FOR PROCESSING SET AN/UYK-64(V)APPENDIX D ADDITIONAL AUTHORIZATION LIST FOR PROCESSOR AN /UYK-64(V) AND l/O INTERFACESECTION II. ADDITIONAL AUTHORIZATION LIST - TM-11-7021-202-120086SECTION II. ADDITIONAL AUTHORIZATION LIST - TM-11-7021-202-120087APPENDIX E EXPENDABLE SUPPLIES AND MATERIALS LIST - TM-11-7021-202-120089SECTION Il. EXPENDABLE SUPPLIES AND MATERIALS LISTGLOSSARY - TM-11-7021-202-120091GLOSSARY -- ContinuedTM-11-7021-202-12 Data Processing Set AN/UYK-64(V)1 (NSN 7035-01-155-0153) Manual