TM 5-2420-224-20-2
BACKHOE CONTROL LEVER REPLACEMENT (CONT)
5. INSTALL
6.
INSTALL
7.
REPEAT
8.
INSTALL
(11).
nut (23) and CLEVIS (24) on control rod (25).
control ROD (25), pin (26), and new cotter pin (27).
STEPS 5 and 6 for seven remaining control rods (28, 29, 30, 31, 32, 33, and 34).
two control RODS (25 and 28), two washers (35), and two new rotter pins (36) in bracket
9.
10.
11.
CONNECT two control RODS (33 and 34) to backhoe control valve (37).
INSTALL two WASHERS (38) and two new cotter pins (39) in two control rods (33 and 34).
INSTALL four PINS (40) and four new cotter pins (41) in four control rods (28, 29, 30, and 31) and
backhoe control valve (37).
4-529