TM 5-2420-224-20-2
CRANE REAR OUTRIGGER REPLACEMENT (CONT)
INSTALLATION
1.
2.
3.
4.
5.
6.
7.
8.
Procedure is the
NOTE
same for both rear outriggers.
INSTALL outrigger HOUSING (8).
EXTEND horizontal cylinder rod END (15).
INSTALL CAPSCREW (14) and new lock nut (13) in horizontal cylinder rod end (15).
POSITION HOSES (11 and 12) and INSTALL hose CLAMP (1O) and new lock nut (9).
INSTALL outrigger LEG (7) in outrigger housing (8).
INSTALL CRANE VERTICAL OUTRIGGER CYLINDER (6) (page 4-700).
INSTALL PAD (5), pin (4), and two retaining rings (3).
INSTALL PIN (2) and hair pin (1).
4-785