TM 5-2420-224-20-2
CRANE REAR OUTRIGGER REPLACEMENT
This task covers:
a. Removal b. Installation
INITIAL SETUP
Applicable Configuration:
Materials/Parts:
HMMH
Nut, Lock
Tools and Special Equipment:
Nut, Lock
Shop Equipment, SC 4910-95-CL-A74
Personnel Required: (2)
Tool Kit, SC 5180-90-CL-N26
R E M O V A L
1.
2.
3.
4.
5.
6.
7.
8.
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
lock NUT.
REMOVE
NUT.
hair pin (1)
Procedure is
and PIN (2).
two retaining rings (3), pin
NOTE
the same for both rear outriggers.
(4), and PAD (5).
CRANE VERTICAL OUTRIGGER CYLINDER
outrigger LEG (7) from outrigger housing (8).
NOTE
(6) (page 4-700).
Tag lines prior to removal to aid in installation.
lock nut (9) and hose CLAMP (10) and SET HOSES (11 and 12) out of the
lock nut (13) and CAPSCREW (14) from horizontal cylinder rod end (15).
RETRACT horizontal cylinder rod END (15).
REMOVE outrigger HOUSING (8).
way. DISCARD
DISCARD lock
4-784