TM 5-2420-224-20-2
FRONT LOADER/FORKLIFT CONTROL VALVE CONTROLS
REPLACEMENT AND ADJUSTMENT (CONT)
15.
16.
17.
18.
INSTALL front Ioader/lorklift control LEVER assembly (26), seal assembly plate (27), three washers
(28), three capscrews (29), and three nuts (30).
INSTALL two BOLTS (31) in lever bracket (2).
CONNECT CABLE
INSTALL two PINS
1.
Loosen two screws
NOTE
Perform step 17 on HMMH only.
(11) to cable (32).
(33) and two hitch pin clips (34) and CONNECT two CLEVISES (6).
(1) on
2.
Rotate two brackets (2) to
3.
Tighten two screws (1) on
two brackets (2).
achieve dimensions
two brackets (2).
shown.
NOTE
Follow-on Maintenance:
Install spare tire and mount (SEE or HMMH) (page 4-390 or 4-391).
4-536