Home
Download PDF
Order CD-ROM
Order in Print
BACKHOE CONTROL TOWER REPLACEMENT (CONT) - TM-5-2420-224-20-2_437
FRONT FENDER AND SPLASH GUARD REPLACEMENT
TM-5-2420-224-20-2 Tractor Wheeled 4x4 DED Small Equipment Excavator (SEE) Manual
Page Navigation
401
402
403
404
405
406
407
408
409
410
411
TM 5-2420-224-20-2
BACKHOE CONTROL TOWER REPLACEMENT (CONT)
11. CONNECT tilt CYLINDER (23) and INSTALL PIN (24) and two retaining rings (25).
NOTE
Follow-on Maintenance:
Install backhoe seat (page 4-444).
4-408