TM 5-2420-224-20-2
BACKHOE CONTROL TOWER REPLACEMENT (CONT)
4.
CONNECT two control RODS (7) to backhoe control valve (8).
5.
INSTALL two washers (9) and two new cotter PINS (10) in two control rods (7).
6.
INSTALL four PINS (11) and four new cotter pins (12) in four control rods (13) and backhoe control
valve (8).
7.
INSTALL
6.
ROTATE
9.
INSTALL
10. INSTALL
NOTE
If needed, adjust control rods at
COVER (14), three washers (15), and three
this time (page 4-531).
self-tapping screws (16) in control tower (17).
two outer control LEVERS (18) outward from center and TIGHTEN two NUTS (19).
five KNOBS (20) on five control levers (18).
grease FITTING (21) in bracket (22).
4-407