TM 5-2420-224-20-2
INSTALLATION
1.
INSTALL two new rubber BOOTS (1).
2.
INSTALL drag LINK (2) in steering arm (3).
3.
INSTALL castellated NUT (4). TIGHTEN NUT
to 107 Ib-ft (145 N.m) and INSTALL new
cotter PIN (5).
1.
Loosen nut (1).
2.
Rotate drag link (2) until it is alined with
pitman arm (3).
3.
Install drag link (2) in pitman arm (3).
4.
Install castellated nut (4). Tighten nut to
107 Ib-ft (145 N.m) and Install new cotter pin
(5).
NOTE
Follow-on Maintenance:
Install front plate (page 4-385).
4-348
DRAG LINK REPLACEMENT AND ADJUSTMENT (CONT)