TM 9-1220-238-14
visually and by touch to assure that the plotting board
terference and shall support the latched chest assembly
components have not been displaced.
when carried with the specified contents. There shall be
d. Air Relief Valves. The air relief valves shall be
no evidence of damage to, or separation of the handle
clean and securely mounted Air flow shall not be
assemblies The rubber tube of each handle shall be free
restricted or obstructed by paint, dirt, dust or other
of paint.
foreign material The valve instruction plates shall be
c. Interface Requirements The board plotting
clearly legible and unobstructed by paint.
components shall be properly positioned in the space
provided. The board plotting components shall then be
manually manipulated to assure there is no excess
5-5. Completion of Inspection.
movement in the stowed positions. The cover then shall
When the board plotting/or chest have been
be closed and latched to the body utilizing normal hand
restored to a completely serviceable condition, it shall
pressure The chest shall then be opened and inspected
be certified that the item is acceptable for "Return to
User" or for "Return to Stock".
5-2