TM 9-1220-238-14
Note The pads (16 and 24) and shim (17) can be
4-14.
Disassembly and Assembly of Bracket
replaced without any disassembly of the bracket.
Remove two thumbscrews (1) and two washers (2)
Place a new shim (17) and new pad (16) on shoe (20)
Assemble in reverse sequence.
Depress the lever (13) until the shoe is in a
maximum open position. The space between pad
4-15.
Disassembly and Assembly of Bracket
(16) and pad (24) should measure 0 240 0 003 Peel
the laminated shim, as required, to obtain the
Remove two thumbscrews (1) and two washers (2)
specified space Use adhesive MMM-A-1617 to bond
Assemble in reverse sequence.
shim to shoe, and pad to shim or pad to slide If It is
necessary.
4-16.
Disassembly and Assembly of Bracket
4-18.
Disassembly and Assembly of Frame
Remove two thumbscrews (1) and two washers (2).
Assemble in reverse sequence.
Remove insert (1) from frame (2) Assemble in reverse
sequence.
4-17.
Disassembly and Assembly of Bracket
4-19.
Disassembly and Assembly of Support
a. Remove pin (1), knob (2), pin (1(3)), shaft (4)
and sleeve (5) from bracket assembly (26).
Remove items (1) through (9) and assemble in
b. Remove setscrew (6), shaft (7) and screw (8).
reverse disassembly sequence.
c. Remove pin (9), collar (10), two pins (11 and
9(12)), lever (13), sprang (14) and crank (15) from slide
4-20. Disassembly and Assembly of Chest (fig. B-
assembly (23) and remove shoe (18) Remove pad (24)
If necessary from slide (25).
a. Disassembly and repair of the carrying chest Is
d. Remove pad (16) and shim (17) if necessary
limited to replacement of the relief valve (4) Refer to
from shoe (20). Remove pin (19) and shoe (20) from
figure B-9 for disassembly/assembly sequence In
the
link (21) Remove pin (22).
event that foam and rubber components become loose
e. Remove insert (27) from bracket (28).
and require the proper adhesive to restore adequate
f. Assemble all items in reverse disassembly
sequence.
adhesive applied.
4-3