2-4. Installation of Equipment.
Connect harness assemblies to test set as shown in
Figure 2-2.
2-5. Seating of Fuses and Lamps.
Line Test Set/Vertical Instrument Display System is
shipped with fuses and lamps in place. Check that
these fuses and lamps are installed and not damaged.
a. l15 VAC 2A
b. 28 VDC 8A
c. 5 VAC 8A
d. 115 VAC Power-on Lamp
TM 55-4920-413-13&P
SECTION III. INSTALLATION INSTRUCTIONS
e. 28 VDC Power-on-Lamp
f. Warning Lamps
(1) LOW OIL PRESS NO. 1
(2) LOW OIL PRESS NO. 2
(3) HIGH OIL TEMP NO. 1
(4) HIGH OIL TEMP NO. 2
(5) ENGINE OUT NO. 1
(6) ENGINE OUT NO. 2
(7) LOW ROTOR SPD
(8) LAMP SUPPLY OVERLOAD NO. 1
(9) LAMP SUPPLY OVERLOAD NO. 2
2-3