TM 5-2420-224-20-2
AUXILIARY HEADLIGHT REPLACEMENT (CONT)
INSTALLATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
NOTE
Procedure is the same
auxiliary headlights.
for both
INSTALL HOUSING (1) and MOUNT (2).
INSTALL HEADLIGHT (3), bushing (4), ground
WIRE (5), and nut (6).
NOTE
Steps 3 thru 6 are for black cable.
STRIP cable INSULATION (7) approximately
1/8 in. (3 mm).
SLIDE two INSULATORS (8 and 9) OVER
cable (7).
PLACE CABLE (7) in cylindrical end of
terminal (10), and CRIMP.
SLIDE two INSULATORS (9 and 8) OVER
terminal (10).
NOTE
Steps 7 thru 10 are for red cable.
STRIP cable INSULATION (11) equal to depth
of terminal well (12).
SLIDE INSULATOR (13) OVER cable (11).
INSERT CABLE (11) into terminal well (12),
and CRIMP.
PLACE slotted WASHER (14) OVER CABLE
(11) AT CRIMPED JUNCTION and SLIDE
INSULATOR (13) OVER slotted washer (14)
and terminal (12).
4-177