TM 11-7440-278-14
(19)
Inform the data processing equipment
operator that unit power is available.
b. OL-89(V) (*)/MYK-8(V). To apply power to the
equipment in the OL-89(V) (*)/MYK-8 (V), perform (1)
through (14) of paragraph 3-30, and the following
procedures:
(1) Turn on the tape control (2804-2) cir-cuit
breaker on the ADP power load center (A9).
(2) Turn on the direct access storage (2314)
circuit breaker on the ac service load center (A6).
(3) Turn on the M.T. unit test receptacle circuit
breaker on the ac service load center (AG).
(4) Inform the data processing equipment
operator that unit power is available.
(5) Ensure that the intercom unit power switch
is on.
c. V-460/MYK-8(V).
(1) Operate the POWER DISTRIBUTION
PANEL MAIN circuit breaker to ON.
(2) Operate the POWNER DISTRIBUTION
PANEL LIGHTS circuit breaker to ON, and the
FLUORESCENT LIGHTS switch to ON.
(3) If blackout conditions are required, operate
the BYPASS BLACKOUT switch to OFF; otherwise
operate it to ON.
3-4.
ADPE Operation
Refer to the applicable publication listed in appendix A
for the operation of IBMI 129 Card Data Recorder.
3-5.
Stopping Procedures
NOTE
In a routine power shutdown, the OL 88(V) (* )/MYK-8(V)
is the last van to be stopped.
a. V-460/MYK-8(V).
(1) Turn off equipment power switches as
described in the applicable manuals listed in appendix A.
(2) Turn circuit breakers on the POWER
DISTRIBUTION PANEL to OFF.
(3) Turn light switches to OFF.
b. OL-88(V)(*)/MYK-8(V) and OL-89(V)(*)/MYK-8
(V).
Figure 3-3. POWER DISTRIBUTION PANEL for V-
(1) Have a qualified personnel cycle ADP
460/MYK-8(V)
equipment down.
(14)
Energize ADP main power circuit breaker.
(2) Press power switch OFF pushbutton on
(15)
Turn on the control unit (2821-1) cir-cuit breaker
CPU console).
on the ADP power load center (A9).
(3) Turn off each circuit breaker on the ADP
(16)
Turn on the processing unit (2030) cir-cuit
load center.
breaker on the ADP power load center (A9).
(4) Turn off ADP power main circuit breaker
(17)
Turn on the CMI1 memory circuit breaker.
(A7).
(18)
Verify that all equipment is receiving power.
3-4