TM 55-4920-410-13&P
CHAPTER 2
SERVICE UPON RECEIPT
Section I. SITE AND SHELTER REQUIREMENTS
2-1. Siting.
The test set operates in the helicopter environment by
being connected to the ac power system.
2-2. Unpacking.
a. Packing Data. When received, the test set is pack-
aged in a plywood carton.
The dimensions and weight when packaged for ship-
ping are:
2-3.
a.
Length 73.7cm (29 inches)
Width 58.4cm (23 inches)
Height 43.2cm (17 inches)
Volume 0.185 cubic meters (6.6 cubic feet)
Weight 40.5 kg (90 lbs) approximately
Atypical shipping carton and contents are shown in Fig-
ure 2-1.
b. Removing contents.
(1) Cut or remove gummed tape from top of carton,
and open top.
(2) Remove polyethylene cushioning material.
(3) Lift test set from carton and remove remaining
polyethylene cushioning material.
Section II. SERVICE UPON RECEIPT OF MATERIEL
Checking Unpacked Equipment.
NOTE
To open test set it, may be necessary to equal-
ize the air pressure by opening the air release
valve.
Inspect equipment for damage during shipment. If
equipment has been damaged, report it on -DD Form 6 in
accordance with instructions in AR 700-58.
b. Check the equipment against the component listing
in the operators manual and the packing slip to see if the
shipment is complete. Report all discrepancies per instruc-
tions of DA PAM 738-751. The equipment should be placed
in service even though a minor assembly or part that does
not affect proper functioning is missing.
c. Check to see whether the equipment has been modi-
fied. (Equipment which has been modified will have the
MWO number on the front panel, near the nomenclature
plate.) Check also to see whether all currently applicable
MWO have been applied. (Current MWO applicable to the
equipment are listed in PAM 310-7.)
2-1