TM 5-2420-224-20-2
A I R B R A K E B O O S T E R R E P L A C E M E N T
This task covers:
a. Removal b. Installation
INITIAL SETUP
Tools and Special Equipment:
Equipment Condition:
Tool Kit, SC 5180-90-CL-N26
Reference
Condition Description
Materials/Parts:
Page 4-388
Outside Engine Hood
Removed
Ring, Seal (2)
Page 4-276
Ring, Seal (2)
Brake Master Cylinder
Removed
Ring, Seal (2)
Page 2-23
Air Pressure Relieved
Ring, Seal (3)
General
Washer, Lock
Washer, Lock (3)
Safety instructions:
W A R N I N G
D o n o t d i s c o n n e c t a n y a i r
system lines or fittings unless
vehicle engine is shut off and
air system pressure is relieved.
To do so could result in injury
to personnel.
R E M O V A L
NOTE
Tag air lines prior to disconnecting
to aid in connecting.
1.
REMOVE three fluid passage BOLTS (1) and
six seal rings (2). Disconnect LINE (3) and
two tubes (4). DISCARD seal RINGS.
4-295